Plastic PVC Big Elbow/Bend Pipe Fitting Injection Mould
Longxiang Introduction
Longxiang Group Limited was established in Guangzhou city in 1998. After over 15 years of hard work, Longxiang has grown to be one of the highest reputable mould maker in China with 120 employees' 5000 sq. Meter working shop.
Up to now, Longxiang has exported about 2400 sets of moulds to 38 countries. The moulds we made include automotive parts (dashboards, inner decorating accessories, etc.), electrical appliances (washing machine, air conditioner,refrigerator, television, etc.), IT industry products (cell phones, computer, etc.), householder products(micro-wave oven, juicer, etc.), office accessories (telephone, printer, etc.) as well as other various of products.
We look forward to participating at the success of your next project.
Worshop show

Mold Specification
Mold Material | 45#,P20 steel, 718, 2738, H13, NAK80, 2344, 2343, S136, etc . |
Mold Type | Plastic Injection Molding |
Product Material | ABS,PA,PA66+GF,POM,PC,PP,PET,TPE,PVC,HDPE,etc |
Mold Standard | HASCO, DME, MISUMI, JIS, LKM, etc. |
Mold Tooling Equipment | Lathe,Milling,Grinder,Drill,CNC,EDM, Wire cut machine,Punch machine |
Injection Mold Machine | 80T to 2800T |
Product Weight | 50-20000g |
GateType | Side Gate, Sub Gate, Direct Gate, Hook Gate, Pin Point Gate, etc. |
Runner Type | Cold Runner or Hot Runner |
Cavity | Single or Multi cavities |
Treatment | Heat treatment and Nitriding,polish ect. |
Mold Life | 45#:50,000 to 100,000 shots |
P20:100,000 to 200,000 shots | |
718: 200,000 to 300,000 shots | |
H13: 300,000 to 500,000 shots | |
Lead Time | Generally mold making will take around 30 days 7-10  day to mass production |
Package | Wooden packing box for molds inner packed in opp bags, outside packed in standard export carton |
Mould show


Our team

Tooling Developing Procedure:
- Quotation: We need your require clearly
- Negotiation: Material, cavity, price, delivery time, payment term, etc.
- Order: According your own design or choice our design
- DFMEA: Deign failure mold & Effect analysis to reduce risk
- Mold design: Â 2D/3D drawing
- Cutting Tooling Notice: After customer approve the mould design will start making mould
- Weekly Report: We will update the mold schedule every week
- Sample Confirm: Send you sample for conform it, if not satisfied by customer. We modify mould.
- Delivery Mold: Delivery mould after customer approve sample and arrange shipment
FAQ
1. Q: Which kind of product can you do?
   A: Plastic injection molding and mass production for plastic parts.
2.  Q: Which kind information need for quotation?
   A: 1) Sample photo with size or 2D/3D design
      2) Product material
      3) The quantity
      4) Runner type, cold or hot
      5) Mould steel type, P20, 718, 2738, H13, S136, 2316, an so on.
3.  Q: I have no 3D drawing, how should I start the new project?
   A: You can supply us a sample or tell me your idea,we will help to finish the  3D drawing design.
4. Q: How long will be the injection mold finished?
   A: Usually it will take about one month to finish the mold.
5. Q: How about the samples?
   A: After mold finished, We will make some samples for you to check as soon as we finish the mold and then deliver the samples for you to check.
6. Q: How about the mould modify?
   A: You can tell us your comment about the samples after you receive them.If there is any dimension different from the drawing,we will modify the mold for free in our side and then make the new samples.
7. Q: How about the proprietary rights of the plastic injection mold?
   A: Customer paid the mould so it all belong to Customer.
8. Q: How about the surface treatment?
    A: Metallization (chrome, gold, silver) / Painting (hand, screen, automated) /Vacuum plating / Lithography
      / Custom texturing/ Hydrographics
Why Choose Longxiang?
- Manufacturing and exporting experience for over 20 years. ISO 9001 approved
- Products are supplied to over 50 countries.
- One-stop service for aluminum profiles, plastic parts, rubber parts, and moulds. Save time and save money for you.
- In-house mold design and building capabilities.
- No reclaimed material used to ensure high quality. Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
- Keep secret to your idea and your design.
- 24 hours (two shifts) / 6 days for production.
- Professional design team, mold maker engineer. OEM/ODM service.
- Professional QC and R&D teams to assure high quality.
- Professional sales team. Good English capabilities and communication skills.
- No MOQ.
- Prompt delivery. For prototype: 3-7 days. Production orders can be arranged specially to meet customer's urgent demands.
- Geographical advantages: within 30 minutes to airport or sea port, near to Hongkong.
Material Specification
Material type | Abbr | Description and typical applications |
Acrylonitrile Butadiene Styrene | ABS | Opaque & tough / Phones & computers |
Polypropylene | PP | Opaque & tough / Beer crates |
Polystyrene | PS | Clear & Brittle / Toys & model kits |
Polystyrene High Impact | HIPS | Opaque & tough / Toys & model kits |
Acetyl | POM | Natural & very tough / Gears & bearings |
Polycarbonate | PC |
Clear and very tough / Street lamp covers & safety helmets |
Plasticized Polyvinylchloride | PVC | Opaque & flexible / Shoe soles & electrical insulation |
Polyamide 6 | PA6 |
Opaque & very tough / Bushes, bearings & curtain fittings |
Polyamide 6.6 | PA6.6 | Opaque, tough and rigid / Housings & handles |
Polyamide 12 | PA12 | Opaque tough & rigid / Air filters & spectacle frames |
Polyethylene low density | LDPE | Waxy tough & flexible / Kitchenware & sealing lids |
Polyethylene high density | HDPE | Waxy tough & stiff / Crates & chair seats |
Thermoplastic Elastomer | TPE | Flexible & tough / Seals & washers |
Thermoplastic Rubber | TPR | Flexible & tough / Seals & washers |
Acrylic | PMMA | Transparent & Brittle / Lenses & car lights &Display |
Polystyrene General Purpose | GPPS | Clear & brittle / Ball point pen barrels |
Polyphenylene Sulphide | PPS | Brown & very strong / Guides & bearings |
Polyphenylene Oxide | PPO | Tough & stable / Electrical parts |
Rigid Polyvinyl Chloride | UPVC | Opaque & tough / Fascia fittings & guttering |
Styrene Acrylonitrile | SAN / AS | Clear & brittle / Table & picnic ware |
Polyether Sulphone | PES | Clear & tough / Metal replacement parts |
Cellulose Acetate | CA | Clear & tough / Spectacle frames |
Self-propelled barges may be used as such when traveling downstream or upstream in placid waters; they are operated as an unpowered Barge, with the assistance of a tugboat, when traveling upstream in faster waters. Canal barges are usually made for the particular canal in which they will operate.Self-propelled barges are useful for inland waterways transport in placid waters. They can also be used with a tug where needed and are useful for lighterage, ferrying, and transport of cargo and construction materials. Our vessel charter team are happy to advise on the right vessel for your needs.
Photo of our Self Propelled Barge:
What is the specifications of our propelled barge
A. General
High accuracy and fully welded, sealed, painted construction can be used for marine engineering of submerged and floating lines in pontoon or dock area or working platform.
B. Construction
The construction is to be built according to the drawing with rules of good workmanship and to be built the longitudinal frame system.
All penetrations of longitudinal through transverse bulkhead are closed with slot plate or stiffeners are interrupted at bulkhead and continuity is realized with brackets, to ensure to avoid any abrupt changes in strength structures.
Subdivided into some watertight compartments, and tanks are pressure tested after completion of all welding but before painting, testing pressure normally 2.35 mwg or 0.2 Bar.
C. Materials
All fabricated steelwork used in the construction of the pontoon will be to manufacturing standard of UniSite or other classification society.
All steel used to be blasted and shop primed both sides.
All materials proposed will be selected to comply with the latest Health and Safety Rules.
Paint systems for hull protection will be of the highest quality (Hempel, Inter, Sigma, Jotun)
D. Welding
All welding will be performed in accordance with drawing and order and UniSite experience and all welding will be continuous.
E. Workmanship
The workmanship on the hull and fittings throughout have good marine practice. Care are taken to ensure fair lines, smooth surfaces and neat welding. All materials and equipment installed in, or delivered with the pontoon will be new and of good marine quality.
Self Propelled Barge
Sand Transport Barge,Tug And Barge,Jack Up Barge,Self Propelled Barge
Unisite Group Ltd. , https://www.shipsparts.nl