- Model NO.: RF132
- Place of Origin: Shanghai China (Mainland)
- Color: Green, Ivory, White
- Connection: Hot Melting
- Specification: DIN8077/2008 ISO15478
- HS Code: 39173900
- Material: PP-R
- Loading Port: Shanghai & Ningbo Port
- Size: 20-75mm
- Trademark: REHOME
- Origin: Shanghai
specifications
PPR water stop valveÂ
1.Material:ppr with brassÂ
2.Top quality and factory priceÂ
3. OEM
Â
Characteristics:
1. Good design, low cost, easy to install and transport.
2. Recyclable, environmental and healthy, conforming to the standards for drinking water.
3. Life span for over 50 years.
Â
Detailed Descriptions:
1) Categories: PP-R stop valve(gate valve), PP-R ball valve, PP-R concealed valve, PE stop valve, PE globe valve, PE concealed valve, other brass fittings.
2) Dimensions:
Diameter: 20mm, 25mm, 32mm, 40mm, 50mm, 63mm, 75mm
Thread size: 1/2", 3/4", 1", 1-1/4", 1-1/2", 2", 2-1/4", 2-1/2".
3) Color: white, gray, green,other colors according to the needs of the clients.
4) Pressure range: PN2.5 Mpa for cold and hot water.
5) Working temperature: -40 - +95°C
6) Quality standards:
According to GB/T 18742.2 which meets with DIN 8077- 8078.
7) Ways of cooperation: OEM, ODM, agent, etc.
Software is a specialized action time predeterming system designed for sewing industry, an easy and understandable method analysis technique and can be used for evaluating such operations as sewing, ironing, inspecting and packing. The program achieve real-time data collection, to ensure the production flow, order delivery time. To achieve the establishment of a transparent and efficient wage system, improve the enthusiasm of employees. To achieve the establishment of scientific quality control system, reduce the repair rate. Also achieve real-time dynamic management of each parking space, each process, each employee. At same time provide scientific, reasonable and accurate data base for lean production management and strategic decision. It has few features, as Standardized management, Automatic operation, Data-based information, Timeliness of problem, Accurate calculation of pieces by employees, Real-time order tracking, Real-time worker monitoring, Real-time target management and QC automation.
Garment Management Data,Production Site Management Program,Clothes Making Process Analysis System,Clothing Industrial Engineering Box
Changshu Bealead Automatic Machine CO., LTD. , https://www.bealeadglobal.com