Runner: Hot Runner
Design Software: Pro-E
Installation: Injeciton
Certification: TS16949, CE, ISO
Standard: DME
Customized: Customized
Product: Household Appliance Parts
Color: Any Color Is Available
Size: Any Size Is Available
OEM & ODM: Offered
Tolerance: ±0.02mm
Mould Base: Lkm, Hasco, Dme
Tooling Machine: CNC
Experience: 17 Years
Trademark: Yixun
Transport Package: Plywood Case
Specification: Customized
Origin: Guangdong, China
HS Code: 8480710009
China Automotive Tools Plastic Mould, Injection Plastic PartsBasic information of our company:
With near 20 years'development, Yixun now have the area of more than 60,000 square meter, regular employees more than 100 and 70 among of them have experience over 10 years.
High precision plastic part production injection mould
Our business scope:
1. Plastic mould design & fabrication
2. Injection moulding
3. Secondary operation
Our product range:
1.car mirror cover mould & parts
2.car grille mould & parts
3.shift knobs mould & parts
4.car door handle mould & parts
5.air filter mould & parts
6.car windshield wiper mould & parts
7.car lamp cover
Specifications
Shaping Mode | Plastic Moulding part & injection parts |
Production Equipment | Elite Plastic Injection Machines ,CNC, Mirror EDM machine, Wire Cutting machine, Carving machine, Lathe Drilling machine, Grinding machine, Milling machine, |
Material steel | P20, 738, 738H, 718, 718H, NAK80, S136, S136H, 2378H, 2311, 2083, 2316, H13, SKD61, 2344, 8407 And other material as requirement |
Part material | ABS, PP,PC, POM ,PVC, PE, PET, PMMA , Acrylic, and other material As requirement |
QC Machine | 3D Measurement, Profile Projector, Hardness Tester and other regular size inspection equipment. |
Mold Cavity | Single or Multi-Cavities Available |
Runner System | Cold or Hot-Runner Available(Hasco, yudo, d-m-e etc.) |
Mould Base | LKM, HASCO, DME etc |
Hardness of steel | Vacuum quenching ,Nitride, HRC41-47, HRC46-50,HRC60 |
Standard mould parts | Dme, hasco, JIS, cumsa etc. |
Mold Lead time | 4Weeks T1 samples , exact time depends on Mould Complexity |
Mould Life | 0.3 Million Shots- 1Million shots (Different steel different production, min mold life 200, 000 shots) |
Packing | Exporting standard (Free fumigation case) |
1.Professional manufacturer
2.Certificates: ISO 9001:2008,TS16949
3. Highly skilled manufacturing process
4. A variety of ODM&OEM product range
5. Strict quality Control System
6. Advanced equipment and excellent R&D Team
7.Software for specification drawings: Pro/E, Auto CAD, solid work 2001,CAXA,UG,CAD,CAM
Our facility
Name | Brand/ Model | QTY |
Vertical Machining Center | (YOUKANG)YK-1060 | 1 |
Vertical Machining Center | (YOUKANG)YK-850 | 1 |
Vertical Machining Center | (YOUJIN)YJ-850 | 1 |
CNC Engraving Machine | (YOUKANG)YK-650 | 1 |
CNC Engraving Machine | (YOUJIN)YJ-540 | 1 |
High Speed CNC Machine | YCM-NXV1020AM | 1 |
Milling Machine | CYX | 4 |
Milling Machine | LITE | 4 |
Milling Machine | TOPONE | 3 |
Dring Machine | Z3132H | 1 |
Dring Machine | Z3132 | 1 |
CNC Deep Hole Dring Machine | WIM | 1 |
E.D.M | (LITE)ZNC-650 | 3 |
E.D.M | (LITE)ZNC-540 | 3 |
E.D.M | (LITE)ZNC-430 | 2 |
E.D.M | TOPONE | 3 |
Mirror E.D.M | Charmille | 1 |
Lathe | CQ1237A | 1 |
Big grinder | M7132B | 2 |
Wire Cut Machine | SANGUANG | 3 |
Grinder | (KENT)KGS-618M3 | 3 |
Air Compressor | NA | 1 |
Voltage | NA | 1 |
Drying Machine | NA | 1 |
2D Measurement | EASSON | 1 |
3D Measurement | Leader | 1 |
Rockwell hardness tester | HR-15VA | 1 |
Vertical injection machine | 35T | 1 |
80T injection machine | (CREATOR)CI-80 | 1 |
80T injection machine | (EASYMASTER)EM80-V | 1 |
80T injection machine | JIADA-80 | 2 |
98T injection machine | (CHENHSONG)JM98-Ai | 2 |
150T injection machine | UNZHJ-150 | 1 |
160T injection machine | (CD)-CJ160M5 | 1 |
250T injection machine | EA250-A ELite | 1 |
350T injection machine | TMC | 1 |
Gas assisted injection molding equipment | PEM | 1 |
Blender Mixer | THOB100 | 1 |
Ultrasonic machine | NA | 2 |
Precision forging press | JA 23-25 | 1 |
Broken Material Machine | THPC400 | 1 |
Broken Material Machine | TSO-100P | 1 |
Broken Material Machine | THPC | 1 |
Controller | NCM-1 | 1 |
Project management flow
Business Step | |
1.R&D | We support customer R&D. Make the files or improve the design if you needed |
↓↓↓ | |
2.Quotation Making | Mould Quotation will be finished in 1 day according to information we get |
↓↓↓ | |
3.Negotiation | The quality ,price ,material, delivery time .payment item. ect |
↓↓↓ | |
4.Mould Design | 3-5Â days for mould and product 3D/2D drawing design |
↓↓↓ | |
5.Mould | According to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in 25-60 days |
↓↓↓ | |
6.Mould Testing | When moulds are finished,we will test the moulds to check it satified consumers' needs.And we will send samples for consumers' reference. |
↓↓↓ | |
7.Sample confirm | If the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory |
↓↓↓ | |
8.Delivery | Delivery goods by sea or by air ,according customers requirement |
Contact information:
Dongguan Yixun Industrial Co.,Ltd.
Veronica sales
Add: Building 1, ZhuGang RD # 19, ShaTou Community, Chang'An Town,
DongGuan City, GuangDong Province, China
Â
Stamping Parts,Machining Parts,Turning Parts Co., Ltd. , http://www.cnstampingparts.com